Download Agenda
Agenda
1 Take action on all consent agenda items.
4-a Arizona Farms Road High Pressure Gas Line Replacement Design-Bid-Build Contract. (Pinal County)

This project includes replacement of existing 4-inch diameter high-pressure natural gas line within the Magma gas system located in Pinal County. The proposed project will replace approximately 26,000 linear feet (4.9 miles) of 4-inch high-pressure steel gas line with a 12-inch diameter high-pressure steel gas line to support system redundancy, and the continuing growth in the region.

Staff recommend awarding a contract to Arizona Pipeline Company, in the amount of $5,598,357.15, and authorizing a change order allowance in the amount of $559,835.72 (10%), for a total authorized amount of $6,158,192.87. This project is funded by Utility Systems Revenue Obligations.
8-a An ordinance adopting titles and schedules of terms/rates/fees/charges for non-residential water utility services. (Citywide) Ordinance No. 6002
10 Items from citizens present.
(Maximum of three speakers for three minutes per speaker.)